About this property

Key features
  • PROPOSED COMMUNITY FACILITY ON NEW DEVELOPMENT OFF CHERRY TREE LANE, SOHAM, ELY, CAMBRIDGESHIRE
Description
PROPOSED COMMUNITY FACILITY ON NEW DEVELOPMENT OFF CHERRY TREE LANE, SOHAM, ELY, CAMBRIDGESHIRE.

Description The site extends to approximately 0.0441 hectares (0.109 acres) as shown edged in red on the plan. The site is located on the northern edge of the proposed new development off Cherry Tree Lane, Soham which was granted outline planning permission (ref. 21/00291/OUM) on 31st October 2023. An application for Reserved Matters for the housing development was validated on 19th March 2024 and is currently pending consideration.

Under paragraph 9 of the Section 106 Agreement dated 27th October 2023 for the site, the Owners are required to submit a Community Facility Specification to the Council for approval prior to the submission of the first application for Reserved Matters. The Community Facility Specification set out below was approved by the Council on 4th March 2024.

Community Facility Specification The Community Facility will be designed in accordance with the following criteria:
•Floor area of circa 200m² (2,150ft²) as shown on indicative floorplan (drawing no. P19-2275_16A).
•No more than two storeys in height.
•Number of car parking spaces to be provided in accordance with Local Plan Policy COM8.
•Provision of secured and covered cycle parking.
•External provision for servicing and refuse storage.

External Appearance The Community Facility will need to be designed sympathetically to the appearance of the surrounding development using principally buff coloured bricks and dark grey tiles.

Access Vehicular and pedestrian access to the site will be over the new estate roads which will be constructed to an adoptable standard and adopted by Cambridgeshire County Council. The vendor will construct an adoptable standard road to the boundary of the site within 18 months of commencing development on site which is anticipated to be January 2025.

The vendor will grant the purchaser a right of way over the estate road until such time as the road is adopted by the County Council subject to the purchaser making good damage which it causes to the estate road during construction of the Community Facility.

Electricity, Water and Telecoms The vendor will provide electricity, water and telecoms services to the site with connection points in the footpath fronting the Community Facility with sufficient capacity for the Community Facility, the precise capacities to be agreed with the purchaser.

Foul and Surface Water Drainage The vendor will provide foul and surface water drainage connections to the boundary of the property with sufficient capacity for the Community Facility, the precise capacities to be agreed with the purchaser.

The vendor will grant the purchaser a right to discharge thorough these pipes until such time as they are adopted subject to contributing towards the maintenance and repair of these pipes.

Timings The purchaser will be required to submit an application for approval of Reserved Matters within 28 days of exchange of contracts and will be required to complete the build within 2 years of approval of Reserved Matters.

User The purchaser will be obliged to enter into a covenant that the building will only be used for a Community Facility.

Tenure The site is offered for sale with vacant possession on completion.

Value Added Tax VAT will be chargeable on the sale price.

Method of Sale The site is offered for sale by private treaty.

Viewings Viewings are strictly by appointment with the Agents:
Cheffins, 25 Market Place, Ely, Cambs. CB7 4NP.
Tel: 01353 654900
Email jonathan.stiff@cheffins.co.uk
Email andrew.amey@cheffins.co.uk

Get in touch

25, Market Place, Ely, CB7 4NP, Cambridgeshire

View similar properties